Grandtech energy solutions

Hybrid Inverter

Compare Grandtech 120/240 V split-phase hybrid solar inverters for projects that combine solar generation, battery storage, and utility power. This collection includes the SEI-12K-UPRO and the 18 kW Grandtech hybrid inverter listing.

Choose by continuous AC output, battery voltage and BMS compatibility, PV input limits, and backup requirements. Verify the exact model and the documentation required by your utility before ordering.

Compare compatible-system requirements with LiFePO4 solar batteries, or request a project quote with your AC service, target output, and battery model.

1 products

Buying guide

Hybrid Inverter FAQs

Answers about solar, battery, grid and backup operation in a hybrid energy system.

What is a hybrid solar inverter?

A hybrid solar inverter manages energy from solar panels, a battery and the utility grid in one system. It can prioritize solar use, charge the battery, supply loads and, when correctly designed, provide backup power during an outage.

Will a hybrid inverter keep the power on during a grid outage?

A hybrid inverter can power designated backup loads during an outage when a compatible battery, required protection equipment and backup wiring are installed. Available backup power and runtime depend on inverter output, battery capacity and the connected loads.

Can a hybrid inverter run without a battery?

Some hybrid inverter models support battery-free operation using solar and grid power. Because operating modes differ by model, confirm the product datasheet and installation settings before designing a system without a battery.

Which batteries work with a 48 V hybrid inverter?

Use a battery within the inverter's permitted DC voltage range and current limits. For lithium batteries, also confirm BMS communication compatibility, CAN or RS485 protocol requirements and the recommended charge and discharge settings.

How do I choose the correct hybrid inverter size?

Compare the inverter's continuous and surge output with the simultaneous loads you expect to run. Also verify AC phase and voltage, PV array limits, battery charging current, bypass current, backup requirements and future expansion plans.